Los Angeles
LA County Board
Agenda Item 34
34. Metro Gold Line Eastside Access Phase II Calvary Cemetery Pedestrian\nPath Project Construction Contract\nRecommendation: Determine that the recommended actions are within the\nscope of the project impacts analyzed in the East Los Angeles 3rd Street Plan\nand Form-Based Code Specific Plan Environmental Impact Report previously\ncertified by the Board; approve the Metro Gold Line Eastside Access Phase II\nCalvary Pedestrian Path Project (Project) (1) and authorize the Director of\nPublic Works to adopt the plans and specifications and advertise for bids at an\nestimated construction contract amount between $8,750,000 and $13,250,000;\nand authorize the Director of Public Works, acting as the Road Commissioner,\nto take the following actions: (Department of Public Works) ADOPT\nAdvertise for bids when ready to advertise the Project;\nDetermine whether the bid of the apparent responsible contractor with\nthe lowest apparent responsive bid is, in fact, responsive and, if not\nresponsive, determine which apparent responsible contractor submitted\nthe lowest responsive bid;\nAward and execute a construction contract for the Project with the\nresponsible contractor with the lowest responsive bid within or less than\nthe estimated cost range, or that exceeds the estimated cost range by no\nmore than 15%, if additional funds have been identified; and\nExtend the date and time for the receipt of bids, allow substitution of\nsubcontractors and relief of bidders, approve and execute change orders\nwithin the same monetary limits delegated to the Director, accept the\nproject upon its final completion, and release retention money withheld.\n(24-5540)