Glendale

City Council

January 28, 2025 Order of Business 4 #f

Agenda Item f

f. Public Works, re: Award Professional Services Agreement (PSA) to Stearns, Conrad\nand Schmidt Engineers Inc, dba SCS Engineers (SCS Engineers), to conduct a study\nof the feasibility of opening the Scholl Canyon Landfill (SCLF) wasteshed, to prepare\na CEQA Analysis in relation to opening the wasteshed, and to perform a cost\nanalysis comparing the existing flexible membrane liner/geosynthetic clay liner\ncomposite cover to evapotranspirative cover systems\n1. Motion authorizing the City Manager, or his designee, to execute a PSA with SCS\nEngineers, to conduct a study of the feasibility of opening the SCLF wasteshed, to\nprepare a CEQA Analysis in relation to opening the wasteshed, and to perform a cost\nanalysis comparing the existing flexible membrane liner/geosynthetic clay liner\ncomposite cover to evapotranspirative cover systems in the not-to-exceed amount of\n$142,500