Calabasas
City Council
Agenda Item 1
1. Revised roundabout analysis: Upon review of the 90% submittal, staff\ndirected the consultant to conduct a study to analyze revising the design from\na traditional roundabout to a mini-roundabout. The traditional roundabout\nwill require the installation of retaining walls along the southerly limit of the\nProject (into the hillside). To potentially reduce the size of the retaining walls\nand lower construction costs, the design team analyzed a smaller\nroundabout. Ultimately, the analysis determined that the smaller roundabout\nwould not provide substantial construction savings.