2. Potholing: Potholing was not included in the original project scope. Potholing\nperformed during the design phase is an efficient method to determine\nwhere underground utility lines are located and mitigates delays and cost\noverruns during the construction phase. Identifying utility and other\nsubsurface conflicts prior to construction also reduces the likelihood of costly\nrepairs to utility lines and encountering safety hazards during construction.\nA pothole report will be prepared and made available to the construction\ncontractor.