Los Angeles
City Council
Agenda Item 18
(18) 15-0100 CD 3 PUBLIC WORKS COMMITTEE REPORT relative to amending the Council action of March 23, 2021 regarding the alley easterly of Reseda Boulevard from Erwin Street to approximately 153 feet northerly of Bessemer Street. Recommendation for Council action, pursuant to Motion (Blumenfield – Harris-Dawson): AMEND the Council action of March 23, 2021, relative to the vacation of the alley easterly of Reseda Boulevard from Erwin Street to approximately 153 feet northerly of Bessemer Street (VAC-E1401262), to adopt the following conditions in lieu of Conditions 6 a. - b. of the Bureau of Engineering Report dated October 13, 2016, attached to the Council file: 6. That the following improvements be constructed adjoining the petitioner's property in a manner satisfactory to the City Engineer: Fund the fabrication and installation of a City Street Transit Amenities Program (STAP) bus shelter to replace and improve an existing bus stop adjacent to the Property at the southeast corner of Reseda Boulevard and Erwin Street, including the dedication of land necessary to widen the sidewalk within the bus stop zone per Bureau of Street Services (BSS) recommendations. Construct a new roadway bus pad on Reseda Boulevard in accordance with Department of Public Works Standard Plan S-433-1 and modify and replace the guide wire adjacent to the existing bus stop per Los Angeles Department of Water and Power requirements and BSS recommendations to allow placement of the STAP bus shelter in a location that avoids conflicts with an existing storm drain.