Los Angeles

PLUM

February 06, 2024 Item #13

Agenda Item 13

(13)\n23-1329-S1\nCD 13\nRelated to Council file No. 23-1329\nMitigated Negative Declaration (MND), No. ENV-2021-7332-MND, Mitigation Monitoring Program prepared for the MND, and Environmental Findings; report from the Los Angeles City Planning Commission (LACPC) relative to a Vesting Tentative Tract (VTT) appeal filed by Santa Monica Boulevard Owner, LLC (Representative: Kyndra Casper, DLA Piper) from the determination of the LACPC in denying the appeal and sustaining the Deputy Advisory Agency’s Determination, dated June 23, 2023, and approving VTT Map No. 83478, pursuant to Sections 17.03 and 17.15 of the Los Angeles Municipal Code; for the demolition of an existing commercial building and the construction of a new 510,621-square-foot production studio and creative office campus with a maximum building height of six stories and 93 feet, including 109,957 square feet of production studios and related support space, 388,286 square feet of creative office space, and 12,378 square feet of restaurant space, with 981 vehicular parking spaces on-site within two levels of subterranean parking, the Project includes the merger of an existing 11,373-square-foot public alley that runs through the project site, a subdivision resulting in a ground lot and eight air space lots, and a waiver for all dedication and street widening requirements, in the Hollywood Community Plan; for the property located at 5601 – 5673 West Santa Monica Boulevard, 5612 – 5666 West Virginia Avenue and 1110 - 1118 North Wilton Place, subject to Modified Conditions of Approval.\nApplicant: Santa Monica Boulevard Owner, LLC\nRepresentative: Kyndra Casper, DLA Piper\nCase No. VTT-83478-2A\nEnvironmental No. ENV-2021-7332-MND\nRelated Case: CPC-2021-7331-ZC-HD-VCU-MCUP-SPR