Agenda Item
· Bell Gardens
City Council — Item 13
Original agenda text
Item
13. RESULTS OF SIDEWALK INSPECTION SURVEY
The City of Bell Gardens maintains approximately 85 miles of sidewalk within its boundaries. It is
important that these sidewalks are inspected on a regular basis as they continue to lift, mainly from
tree roots, which result in hazardous conditions and increase the City’s liability from potential trip
and fall incidents. In September 2022, the City Council awarded Precision Concrete Cutting, Inc. a
5
contract for the inspection of sidewalks citywide and identification of hazardous conditions. The
results identified 2,168 sidewalk sections that are lifted/raised requiring repair by grinding or saw
cutting, and 121 sidewalk sections (approximately 44,191 square feet) that are broken requiring
removal and replacement. Staff estimates it will take approximately 12 months to complete repairs
to all identified sidewalk locations. Inspections will continue on an annual basis following repairs.
Recommendation:
It is staff's recommendation that the City Council receive and file this item.