Lancaster
City Council
CC 5.
Task Order for Multi-Year Professional Services (Service Group Category 10 -
Drainage, Hydrology and Hydraulic Engineering) for Channel Improvements between
40th Street West and 42nd Street West from Avenue N to Existing Basin (Reference
PWCP 24-007)
Recommendation(s):
1. Approve Task Order No. 1 with BKF Engineers, of Newport Beach, California, in
accordance with the Multi-Year Professional Services Agreement, Service Group
Category (SGC) 10 - Drainage, Hydrology and Hydraulic Engineering, to provide
Design Services for Channel Improvements between 40th Street West and 42nd Street
West from Avenue N to Existing Basin in the amount of $224,323.00 plus a 10%
contingency; and authorize the City Manager, or his designee, to sign all documents.
2. Find that the approval of a Task Order is not a project under California
Environmental Quality Act (CEQA) Guideline Section 15378(b)(5) (CCR, Title 4,
Chapter 3, Article 20).
This project was identified within the City’s Master Plan of Drainage as a project for
channel concrete lining for maintenance purposes and capacity improvements to
accommodate new upstream flows from development. The City is proposing Master
Plan of Drainage Channel Improvements for the Earthen Drainage Channel between
40th Street West and 42nd Street West from Avenue N and the existing basin to the
north. The project will include installation of a concrete lined channel forty-five feet in
width and nine feet in height for approximately 3,600 lineal feet in length.