4.B. WILLIAM S. HART PARK SITE IMPROVEMENTS [R. ABRAMSON,
M. BARKER, S. CAMPBELL, H. COLLINS]:
The City Council will consider a two-phase approach to improving Hart Park.
Phase 1 Improvements include site access and disability upgrades, a
reconfiguration and surface material replacement of the off-leash dog area,
and associated enhancements identified during the community outreach
process. Phase 2 Improvements for additional opportunities for enhancements
that resulted from the community outreach process shall be considered through
a Subcommittee led evaluation process.
RECOMMENDATIONS: 1) Direct staff to proceed with the recommended
Phase 1 Improvements as follows: a) Upgrade all pedestrian path-of-travel
routes and proceed with site accessibility barrier-removal improvements in
locations identified in the Certified Access Specialist (CASp) Report, b)
Reconfigure the off-leash dog area in accordance with the results of the
community outreach process, c) Remove the existing wood chip surface
material and replace it with dog-friendly synthetic turf, d) Retain a consultant
to provide design and engineering services, to produce construction
documents, and work with a Construction Manager to prepare a revised project
cost estimate. Staff will return to Council upon completion for approval of the
final design and budget prior to proceeding with the bidding process for
construction; 2) Direct staff to form a City Council Ad-Hoc Hart Park
Subcommittee to evaluate, as a Phase 2 effort, concepts and potential
enhancements that arose during the community outreach process, determine a
scope of work to be explored by a consultant, and make recommendations to
the City Council regarding additional desired improvements; and 3) Authorize
the Director of Finance & Technology Services to allocate $600,000 from
unallocated reserves in the Park Development Fund for design, engineering,
consulting, construction management services for the Phase 1 Improvements,
additional studies as part of Phase 2, and related costs.