Agenda Item · West Hollywood

City Council — Item B

West Hollywood April 04, 2023 City Council Item B
Original agenda text Unfinished Business
4.B. WILLIAM S. HART PARK SITE IMPROVEMENTS [R. ABRAMSON, M. BARKER, S. CAMPBELL, H. COLLINS]: The City Council will consider a two-phase approach to improving Hart Park. Phase 1 Improvements include site access and disability upgrades, a reconfiguration and surface material replacement of the off-leash dog area, and associated enhancements identified during the community outreach process. Phase 2 Improvements for additional opportunities for enhancements that resulted from the community outreach process shall be considered through a Subcommittee led evaluation process. RECOMMENDATIONS: 1) Direct staff to proceed with the recommended Phase 1 Improvements as follows: a) Upgrade all pedestrian path-of-travel routes and proceed with site accessibility barrier-removal improvements in locations identified in the Certified Access Specialist (CASp) Report, b) Reconfigure the off-leash dog area in accordance with the results of the community outreach process, c) Remove the existing wood chip surface material and replace it with dog-friendly synthetic turf, d) Retain a consultant to provide design and engineering services, to produce construction documents, and work with a Construction Manager to prepare a revised project cost estimate. Staff will return to Council upon completion for approval of the final design and budget prior to proceeding with the bidding process for construction; 2) Direct staff to form a City Council Ad-Hoc Hart Park Subcommittee to evaluate, as a Phase 2 effort, concepts and potential enhancements that arose during the community outreach process, determine a scope of work to be explored by a consultant, and make recommendations to the City Council regarding additional desired improvements; and 3) Authorize the Director of Finance & Technology Services to allocate $600,000 from unallocated reserves in the Park Development Fund for design, engineering, consulting, construction management services for the Phase 1 Improvements, additional studies as part of Phase 2, and related costs. STAFF REPORT ITEM 4.B. - ATTACHMENT A ITEM 4.B. - ATTACHMENT B ITEM 4.B. - ATTACHMENT C