13. Services Agreement with Camfil Power Systems
Recommendation:
A. Find that approval of the proposed action is exempt from California Environmental Quality
Act (CEQA) review, because it is an administrative activity that will not result in direct or indirect
physical changes in the environment, and therefore does not constitute a “project” as defined
by CEQA Guidelines Section 15378. To the extent the future installation of the equipment
constitutes a “project”, staff anticipates that the work will be exempt from CEQA review in
accordance with CEQA Guidelines Section 15302, because the project consists of the
replacement or reconstruction of existing equipment where the new equipment will be located
on the same site as the equipment replaced and will have substantially the same purpose and
capacity as the equipment replaced; the installation work will be procured through a separate
selection process and contract at a later date.
B. Approve and authorize the City Administrator to execute a Services Agreement with Camfil
Power Systems (Camfil), in substantially the same form as submitted, to provide engineering
and design services for generator cooling filter housing modification for a total amount not-to-
exceed $250,576; and
C. Authorize a contingency amount of 10% or $25,100 in the event of unforeseen changes in
the project and grant authority to the City Administrator to issue amendments for an amount