Agenda Item · Los Angeles

Board of Public Works — Item 4

Los Angeles February 14, 2024 Board of Public Works Item 4
Original agenda text Item
(4) BPW­2024­0081 CD 10 STREET CLOSURE – WILSHIRE BOULEVARD, BETWEEN WESTERN AVENUE AND ST. ANDREWS PLACE – METRO WESTSIDE PURPLE LINE EXTENSION PROJECT, SECTION 1 Recommending the Board: 1. FIND that the Board has reviewed and considered the information in the Los Angeles County Metropolitan Transportation Authority (Metro) Westside Purple Line Extension Project Section 1 Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) (Transmittal No. 1) and the Project Final EIS/EIR (Transmittal No. 2); 2. FIND under the California Public Resources Code, Section 21166, and the California Environmental Quality Act (CEQA) Guidelines, Section 15162, on the basis of substantial evidence contained in the whole record, that since certification of the EIS/EIR, there have been no changes with respect to the circumstances under which the temporary street closure being undertaken would require a subsequent EIR or supplemental EIR; 3. A D O P T t h e M a r c h 2 0 1 2 M i t i g a t i o n M o n i t o r i n g a n d R e p o r t i n g Program (Appendix I of the Final EIS/EIR) prepared by the Metro, as it pertains to construction impacts; 4. FIND under CEQA Guidelines, Section 15091, that changes have been incorporated into the project which substantially lessen the significant environmental effects, as identified in the EIS/EIR. Further, find that there is no feasible alternative or additional feasible mitigation measures within the Board’s powers that would substantially lessen any significant effect the project would have on the environment; 5. ADOPT the attached CEQA Findings of Fact and Statement of Overriding Considerations (Transmittal No. 3), as it pertains to the temporary street closure, and find that the economic, social, technological, and other benefits 4. FIND under CEQA Guidelines, Section 15091, that changes have been incorporated into the project which substantially lessen the significant environmental effects, as identified in the EIS/EIR. Further, find that there is no feasible alternative or additional feasible mitigation measures within the Board’s powers that would substantially lessen any significant effect the project would have on the environment; 5. ADOPT the attached CEQA Findings of Fact and Statement of Overriding Considerations (Transmittal No. 3), as it pertains to the temporary street closure, and find that the economic, social, technological, and other benefits of the project outweigh its significant and unavoidable impacts; 6. ADOPT the Westside Purple Line Extension, Section 1 Decking Removal and Street Restoration Utilizing Weekend Closures of Wilshire Boulevard, beginning March 1, 2024, at 9:00 PM and ending March 25, 2024, at 6:00 AM (Transmittal No. 4); 7. SPECIFY that the Metro Transit Division of the Bureau of Engineering, located at 1149 South Broadway, the Board, located at 200 North Spring Street, and other relevant City of Los Angeles departments are custodians of the documents or other material which constitute the record of the proceedings upon which the Board’s decision is based; and 8. APPROVE temporary closure of Wilshire Boulevard between Western Avenue and St. Andrews Place for four consecutive weekends, beginning March 1, 2024 and ending March 25, 2024 (Transmittal No. 5), subject to the conditions identified within this report. Weekend 1: March 1 ­ March 4 Weekend 2: March 8 ­ March 11 Weekend 3 (contingency): March 15 ­ March 18 Weekend 4 (contingency): March 22 ­ March 25 (W.O. E1907395) BUREAU OF STREET SERVICES