64. Devil's Gate Reservoir Annual Cleanout '24 and '25 Project Construction
Contract
Recommendation: Acting as the Governing Body of the Los Angeles County
Flood Control District, find that the proposed Devil’s Gate Reservoir Annual
Cleanout ’24 and ’24 Project (Project), and related actions are within the scope
of the Final Environmental Impact Report (FEIR), together with the recirculated
portions of the FEIR previously certified by the Board for the Devil’s Gate
Reservoir Sediment Removal and Management Project; find that the impacts of
the Project previously analyzed in the FEIR comply with the California
Environmantal Quality Act and the previously adopted Mitigation Monitoring and
Reporting Program, Findings of Fact Statement of Overriding Considerations
continue to be applicable; find on the basis of the whole record before the
Board that no changes are proposed or substantial changes have occurred;
authorize the Chief Engineer of the County Flood Control District to adopt the
plans and specifications for the Devil's Gate Reservoir Annual Cleanout '24 and
'25 Project in the City of Pasadena (5), at an estimated construction contract
cost between $8,000,000 and $12,250,000; advertise for bids when ready to
advertise the project; and authorize the Chief Engineer of the County Flood
Control District to take the following actions: (Department of Public Works)
ADOPT
Determine whether the bid of the apparent responsible contractor with
the lowest apparent responsive bid is, in fact, responsive and, if not
responsive, determine which apparent responsible contractor submitted
the lowest responsive bid;
Award and execute a construction contract for the Project with the
responsible contractor with the lowest responsive bid within or less than
the estimated cost range or that exceeds the estimated cost range by no
more than 15%, if additional funds have been identified; and
Extend the date and time for the receipt of bids, allow substitution of
subcontractors and relief of bidders, approve and execute change orders
within the same monetary limits delegated to the Director of Public
Works, accept the Project upon its final completion, and release
retention money withheld. (24-0691)