Agenda Item
· Signal Hill
City Council — Item c
Original agenda text
Order of Business 14
c. RESOLUTION DECLARING FINAL ACCEPTANCE OF THE 33RD STREET
WATER MAIN REPLACEMENT PROJECT PURSUANT TO THE PUBLIC
WORKS CONTRACT WITH TTS ENGINEERING INCORPORATED
Summary:
The 33rd Street Water Main Replacement Project is part of the City’s ongoing
efforts to replace over 15 miles of existing cast iron potable water pipelines
citywide with ductile iron pipes. This project involved replacing approximately
2,690 linear feet of existing cast iron main with 12-inch and 16-inch diameter
ductile iron water mains, 18 water service replacements, eight fire service
replacements, 26 valve replacements and reconstruction of nine ADA curb
ramps.
TTS Engineering Incorporated (TTS) completed work for the 33rd Street Water
Main Replacement Project (Project No. 95.22003) to the satisfaction of the
Public Works Department and in accordance with the project specifications.
Staff recommends the City Council adopt a resolution declaring final acceptance
of the work performed by TTS.
Strategic Plan Goal(s):
Goal No. 4 Infrastructure: Maintain and improve the City’s physical
infrastructure, water system, and recreational spaces.
Recommendation:
Adopt a resolution, entitled:
A RESOLUTION OF THE CITY OF SIGNAL HILL, CALIFORNIA, DECLARING
WORK TO BE COMPLETED IN CONFORMANCE WITH THE PLAN
SPECIFICATIONS FOR 33RD STREET WATER MAIN REPLACEMENT
PROJECT (PROJECT NO. 95.22003), IN ACCORDANCE WITH THE
CONTRACT ENTERED INTO BETWEEN TTS ENGINEERING
INCORPORATED AND THE CITY OF SIGNAL HILL