Agenda Item
· Los Angeles
LA County Board — Item 13
Original agenda text
Item
13. Ensuring the Safe Opening of Mental Health Rehabilitation Center Beds at
Martin Luther King, Jr. Medical Campus’ Behavioral Health Center
Recommendation as submitted by Supervisor Mitchell: Authorize the Director of
Mental Health to negotiate, and execute Legal Entity (LE) contracts for the
provision of Mental Health Rehabilitation Center (MHRC) services at the
Behavioral Health Center (BHC) at the Martin Luther King, Jr. (MLK) Medical
Campus with Life Generations Healthcare, LLC, NewGen Health, and Behavioral
Health Management Systems, for a term of three fiscal years with two one-year
extension options, at an estimated total annual amount not to exceed $6,500,000
per contract, to be fully funded by Medi-Cal and State Realignment revenues;
and take the following actions:
Authorize the Director of Mental Health to prepare, and execute future
amendments to the contracts to add, delete, modify or replace the
service exhibits and/or statements of work, reflect Federal, State, and
County regulatory and/or policy changes, revise the annual Maximum
Contract Allowances (MCAs), provided that the increase will not exceed
25% of the applicable MCA and sufficient funds are available, terminate
the contract in accordance with the contract termination provisions,
including termination for convenience or termination for any repeated
performance or quality of care issues, and increase monitoring or
require corrective action plans as appropriate;
Authorize the Director of Mental Health to make non-material
modifications to the LE contract through administrative amendments or
change notices for the following and other similar reasons, as
appropriate: change the LE contractor’s business name and/or
headquarters address; change, revise, add, or delete the LE contractor’s
provider site address(es), site number(s), and/or site name(s); make
technical corrections; revise County and contractor administration
exhibits; and/or shift funds between currently contracted funded
programs, so long as such shift(s) will not cause an increase in the MCA;
Exempt the Department of Mental Health’s (DMH) LE contract from the
six-month advance notification requirement under Board Policy No.
5.100, when DMH does not have delegated authority to extend the term of
the contract;
Instruct the Director of Mental Health to take the following steps to ensure
quality of care:
For all admitted clients, track and issue quarterly aggregate
reports, by contractor, on contractor performance metrics
including, but not limited to, client diagnosis, including any special
behavior issues affecting the client’s placement, client
demographics, including race, ethnicity, age and language
preference, if known, whether the client has a co-occurring
substance use disorder, where the client was admitted from, the
contractors’ usage of seclusion or chemical/physical restraints
including, for each contractor, the specific data that is required by
California Health & Safety Code Section 1180; length of stay
(average, short and longest stays); number (or percentage) of
clients who were ready for discharge but remained, including a
notation of discharge barriers and the number (or percentage) of
clients who were successfully stepped down to lower levels of
care; the number of clients on conservatorship status; the number
of adverse client incidents, and corrective action taken; the
number of client grievances and subject matter; the instances
where clients require non-routine medical care, including
treatment for pressure ulcers or medication errors, urgent care or
emergency care; in preparation for clients needing emergency
care, how contractors and DMH are coordinating with expected
receiving hospitals for both psychiatric and non-psychiatric
emergencies both before and after opening of the beds; and
compliance with staff to patient staffing levels, including staff
turnover rates;
Ensure the minimal use of seclusion and physical/chemical
restraints by requiring contractors to comply with applicable
Federal, State and local laws, rules and regulations and monitoring
contractors’ compliance with those practices, with DMH to
encourage contractors to meet best community standards;
To the maximum extent possible, ensure the contractors’
emergency and disaster plans align and are coordinated with
those of other MLK Medical Campus providers, especially other
providers inside the BHC;
Randomly, but no less than once a month, conduct unannounced
site visits, as well as the weekly Health Access and Integration field
liaison site visits, to ensure the services are meeting the standards
of the Board’s Care First/Jails Last restorative justice goals and
directives of this motion;
Every six months, perform an audit by an appropriately licensed
clinician on each contractor to ensure adherence to the contract
components and include findings in the quarterly report, also,
conduct written audits and utilization reviews by an independent
contractor or appropriately licensed clinical Department staff of
case files to ensure accuracy of data reports, appropriate staffing
levels and training completion requirements are being met, and to
understand reasons for delays in transfers to lower levels of care,
especially for clients who have been placed in these beds for more
than six months;
Prior to contract commencement, require contractors to submit
detailed staff to patient/client ratios, specific protocols for
preventing/addressing common adverse patient/client incidents, a
plan for rapid response to deteriorating client conditions; and staff
training requirements and training schedule; and
Immediately report back to the Board in writing, any significant
adverse patient/client incidents including, but not limited to, suicide
or suicide attempts, absence without leave, death or serious injury
of clients, significant criminal behavior, significant medication
errors, discovery of untreated but preventable serious medical
conditions, such as pressure ulcers, and/or any other incident
which may result in significant harm to the clients or staff, with
both DMH and contractors to report these incidents immediately as
required by contract, with all efforts made to ensure reporting
within 72 hours of occurrence. (24-5084)