Agenda Item
· Glendale
City Council — Item f
Original agenda text
Order of Business 4
f. Public Works, re: Award Professional Services Agreement (PSA) to Stearns, Conrad
and Schmidt Engineers Inc, dba SCS Engineers (SCS Engineers), to conduct a study
of the feasibility of opening the Scholl Canyon Landfill (SCLF) wasteshed, to prepare
a CEQA Analysis in relation to opening the wasteshed, and to perform a cost
analysis comparing the existing flexible membrane liner/geosynthetic clay liner
composite cover to evapotranspirative cover systems
1. Motion authorizing the City Manager, or his designee, to execute a PSA with SCS
Engineers, to conduct a study of the feasibility of opening the SCLF wasteshed, to
prepare a CEQA Analysis in relation to opening the wasteshed, and to perform a cost
analysis comparing the existing flexible membrane liner/geosynthetic clay liner
composite cover to evapotranspirative cover systems in the not-to-exceed amount of
$142,500