1. Revised roundabout analysis: Upon review of the 90% submittal, staff
directed the consultant to conduct a study to analyze revising the design from
a traditional roundabout to a mini-roundabout. The traditional roundabout
will require the installation of retaining walls along the southerly limit of the
Project (into the hillside). To potentially reduce the size of the retaining walls
and lower construction costs, the design team analyzed a smaller
roundabout. Ultimately, the analysis determined that the smaller roundabout
would not provide substantial construction savings.