Agenda Item · Los Angeles

PLUM — Item 10

Los Angeles June 25, 2025 PLUM Item 10
Original agenda text Item
(10) 17-1041-S1 CD 11 Environmental Impact Report (EIR), Draft EIR, No. ENV-2020-3533-EIR [State Clearinghouse (SCH) No. 2020120119], Final EIR, and Erratum (collectively, New Beatrice West Project EIR), Statement of Overriding Considerations, Mitigation Monitoring Program, and related California Environmental Quality Act findings; report from the Los Angeles City Planning Commission (LACPC); and, an Appeal filed by Supporters Alliance for Environmental Responsibility (SAFER) (Representative: Lozeau Drury LLP, Mitchell Thielemann), from the LACPC’s determination in approving an EIR as the environmental clearance for the demolition of an existing 23,072 square-foot office building and two accessory buildings, totaling 7,188 square feet; the retention of an 87,881 square-foot office building; and the construction of a new eight-story office building with up to 196,100 square feet of office space and 3,400 square feet of ground floor commercial space, upon completion, the Project would total 287,381 square feet of floor area on an approximately 4.5-acre site, with a Floor Area Ratio of 1.46:1, the new office building would include three abovegrade and two subterranean levels of parking (additional parking would be provided in the surface parking lot adjacent to the existing office building located at 12541 West Beatrice Street) and would have a maximum building height of 135 feet to the top of the parapet; for the properties located at 12531 12575 West Beatrice Street; and 5410 - 5454 South Jandy Place. Applicant: NSB Associates, Inc. Representative: Clare Bronowski, Rand, Paster & Nelson, LLP Case No. ENV-2020-3533-EIR-1A Environmental No. ENV-2020-3533-EIR Related Case Nos: CPC-2016-1208-CU-SPR-1A; AA-2017-397-PMEX-1A; ENV-2016-1209-MND Fiscal Impact Statement: No