Agenda Item · Los Angeles

PLUM — Item 13

Los Angeles September 09, 2025 PLUM Item 13
Original agenda text Item
(13) 25-0811 CD 13 Categorical Exemption from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines, Article 19, Section 15332, Class 32, and related CEQA findings; report from the Los Angeles City Planning Commission (LACPC); and, Appeals filed by: 1) Supporters Alliance for Environmental Responsibility (SAFER) (Representative: Richard Drury, Lozeau Drury LLP); and 2) Justin Maurer and Noemi Santo, Carlton Serrano Tenants Association, from the determination of the LACPC in approving, pursuant to Chapter 1A of the Los Angeles Municipal Code (LAMC) Section 13.B.4.2, a Specific Plan Project Compliance to allow the demolition of seven existing residential buildings and accessory uses, inclusive of a 16-unit apartment building, a four-unit apartment building, three single family dwellings, a detached garage, and a duplex building and the construction, use and maintenance of eight-story, 131-unit residential building and the maintenance of an existing two-story, eight-unit residential building, for a total of 139 units, within Subarea A (Neighborhood Conservation) of the Vermont/Western Transit Oriented District Station Neighborhood Area Plan (SNAP) Specific Plan; for the demolition of seven existing residential buildings and accessory uses, the maintenance of an existing eight-unit apartment building, and the construction, use, and maintenance of a new 131-unit apartment building, with 15 units restricted to Very Low Income Households, for a total of 139 units, on an approximately 37,688.3 square-foot (0.87 acre) site. The proposed project includes the removal of two street trees, three on-site protected trees, and 12 on-site non-protected trees. The proposed project is comprised of an eight-story, 105-foot and four-inch in height residential building, with one at-grade parking level and two and a half subterranean parking levels, and a total of 144,851 square feet of floor area resulting in a floor area ratio (FAR) of 4.8:1. The Project will provide 148 vehicular parking spaces, 70 long term and two short term bicycle parking spaces, 3,405 square feet of usable open space, 35 on-site trees and 10 street trees. The Project will require the export of approximately 26,100 cubic yards of soil; for the properties located at 5416 - 5418, 5420, 5424 - 5428 and 5430 West Carlton Way, subject to Conditions of Approval; and adoption of project findings. Applicant: Maria Flores, 5430 Carlton, LLC Representative: Gary Benjamin, Alchemy Planning + Land Use Case No. CPC-2024-914-DB-SPPC-VHCA-1A Environmental No. ENV-2024-915-CE Fiscal Impact Statement: No