Los Angeles
Public Works
Agenda Item 5
(5) 210458\nCD 9 Draft and Final Environmental Impact Report and City Engineer report\nrelative to the vacation of portions of Pico Boulevard and LA Live Way\n(subsurface space, air space, and street vacation) (VAC E1401376).