Signal Hill
City Council
Agenda Item A
a. MEMORANDUM OF UNDERSTANDING (MOU) WITH CITY OF LONG BEACH\nAND PUBLIC WORKS CONTRACT WITH INTERNATIONAL LINE BUILDERS,\nINC. DBA ILB ELECTRIC FOR EAST 20TH STREET AND REDONDO\nAVENUE INTERSECTION IMPROVEMENT PROJECT (PROJECT NO.\n90.20007)\nSummary:\nStaff recommends the City Council consider entering into an MOU with City of\nLong Beach and a Public Works Contract with ILB Electric for construction of the\nEast 20th Street and Redondo Avenue Intersection Improvement Project. This\nscope of work for this Project includes the following tasks:\n· Installation of new traffic signal poles and foundations, signal mast arms,\nLED luminaire, signal heads, countdown pedestrian heads, pedestrian\npush buttons, pedestrian push button signs, pullboxes, PVC conduits (3”),\nand conductors;\n· Installation of Type E and Type D inductive vehicle detector loops;\n· Traffic striping and installation of internally illuminated street name sign;\nand\n· Installation of grated line drain, and curb ramp per Caltrans Standard\nPlans D98H and A88A, Case C respectively.\nRecommendations:\n1. Authorize the City Manager to enter into an MOU with City of Long Beach for\nconstruction of the project, in a form approved by the City Attorney.\n2. Authorize the City Manager to enter into a Public Works Contract with ILB\nElectric for construction of the Project, in a form approved by the City\nAttorney. The term of the agreement is for 90 working days upon issuance of\nNotice to Proceed with a not-to-exceed contract amount of $448,479.00.\n3. Authorize contingencies of 10% ($44,847.90) and up to a 180-day term\nextension pursuant to the City’s Purchasing and Contracting Guidelines, to\nbe utilized if approved by the Public Works Director.