Alhambra
City Council
Agenda Item 11
11.\nNOTICE INVITING BIDS: REHABILITATION OF THE STORM DRAIN ON CARLOS\nAVENUE – F2M25-64, N2M25-175\nThe storm drain pipe located at Carlos Avenue, which is from 2027 Carlos Avenue to\nMontezuma Avenue, has been broken and needs to be repaired to handle normal water\nflow before flooding occurs. Due to the pipe passing through many private properties, the\npipe lining method is a preferable way to repair the pipe. This storm drain pipe is 18-inch\nin diameter and about 300 feet in length. Plans and specifications have been prepared.\nStaff has reviewed the plans, and found them to be consistent with City’s standards.\nRecommended Action:\nCity Council approve the distribution of a Notice Inviting Bids\nto qualified contractors for the Rehabilitation of the Storm Drain on Carlos Avenue with\nbids due no later than 10:30 a.m. on Thursday January 8, 2026, and opened at 11:00 a.m.\nthat same day; and, direct staff to undertake the steps necessary to finalize the Council’s\naction.