Lakewood

City Council

December 12, 2023 Routine Item #9

Agenda Item 9

RI-9 APPROVAL OF AFTER STUDY AND DESIGN ENGINEERING SERVICES FOR\nUNCONTROLLED MARKED CROSSWALKS - Staff recommends the City Council appropriate\n$100,000 in the project account 10109908-58800-60062 from the General Fund, for the after study\nand design engineering services related to the uncontrolled marked crosswalks; authorize Willdan\nEngineering’s services to conduct the after study and develop the technical memorandum of the\nuncontrolled marked crosswalks pilot locations, under their existing Agreement for Engineering\nServices, in an amount of $21,241 and authorize the Mayor to sign the proposal; and authorize\nWilldan Engineering’s design engineer services for the additional 23 uncontrolled marked\ncrosswalks, under their existing Agreement for Engineering Services, in an amount of $134,000 and\nauthorize the Mayor to sign the proposal\nREPORTS: