8. AUTHORIZE RFP: PROFESSIONAL ENGINEERING DESIGN SERVICES FOR THE
WATER MAIN REPLACEMENT PROJECT ON HALSTEAD CIRCLE, HIDALGO
AVENUE, AND MAIN STREET – F2M23-30, RFP2M23-8
The Utilities Department regularly installs water mains to replace aging pipelines and to
improve system reliability and water quality. The six-inch cast iron water main pipes on
Halstead Circle between North and South Vega Street and on Hidalgo Avenue between
Main Street and Alhambra Road were installed in the 1920’s. The four-inch cast iron water
main pipe on Main Street between Champion Place and Hidalgo Avenue was installed in
1910. The water main pipes have a history of breaks. These water main lines should be
replaced to improve flow and firefighting capabilities in an emergency. This project would
replace the existing four-inch and six-inch cast iron water mains with new 8-inch ductile
iron water mains.
Recommended Action: City Council approve the distribution of a Request for
Proposals for Professional Engineering Design Services for the Water Main Replacement
Project on Halstead Circle, Hidalgo Avenue, and Main Street with proposals due no later
than 4:00 p.m. on April 13, 2022; and, direct staff to undertake the steps necessary to