Agenda Item · Los Angeles

LA County Board — Item 54

Los Angeles April 04, 2023 LA County Board Item 54
Original agenda text Item
54. Project No. 450 - Alamitos Bay Pump Station Discharge Line Replacement Contract Recommendation: Acting as the Governing Body of the County Flood Control District (District), find that the recommended actions are within the scope of Project No. 450 - Alamitos Bay Pump Station Discharge Line Replacement project (Project) in the City of Long Beach (4) impacts previously analyzed in the Mitigated Negative Declaration to comply with the California Environmental Quality Act previously adopted by the Board; adopt the Mitigation Monitoring and Reporting Program (MMRP) previously adopted by the Board; find that the MMRP is adequately designed to ensure compliance with the mitigation measures during Project implementation; find on the basis of the whole record for the Board that no changes are proposed in the Project or substantial changes have occurred with respect to the circumstances, which the Project is being undertaken; approve the Project and authorize the Chief Engineer of the District to adopt the plans and specifications, and advertise for bids at an estimated construction contract cost between $3,600,000 and $5,400,000 for the Project; and authorize the Chief Engineer of the District to take the following related actions: (Department of Public Works) ADOPT Instruct the Executive Officer of the Board to advertise for bids when ready to advertise the Project; Determine whether the bid of the apparent responsible contractor with the lowest apparent responsive bid is, in fact, responsive and, if not responsive, determine which apparent responsible contractor submitted the lowest responsive bid; Award and execute a construction contract with the responsible contractor with the lowest responsive bid within or less than the estimated amount range of $3,600,000 and $5,400,000, or exceeds the estimated cost range by no more than 15% if additional and appropriate funds have been identified; and Extend the date and time for the receipt of bids, allow substitution of subcontractors and relief of bidders, approve and execute change orders within the same monetary limits delegated to the Director of Public Works, accept the Project upon its final completion, and release retention money withheld. (23-1274) Attachments: Board Letter Public Comment/Correspondence