8. AUTHORIZE RFP: PROFESSIONAL ENGINEERING DESIGN SERVICES FOR THE
GREEN STREET DEMONSTRATION STORMWATER CAPTURE PROJECT ON MAIN
STREET – F2M23-56, RFP2M23-21
The proposed Green Street Demonstration Stormwater Capture Project is identified as a
priority concept in the City’s Stormwater Master Plan. The Project is a first of its kind within
the City of Alhambra and will provide multiple benefits to the neighborhood and the
surrounding environment while also reducing stormwater runoff volumes and pollutant
loads to receiving waters. The Project will also beautify Main Street; comply with water
quality regulations; enhance open space, include California native drought tolerant
plantings and habitat; and demonstrate to the public the benefits of green infrastructure.
Recommended Action: City Council authorize the distribution of a Request for
Proposals to qualified firms for Professional Engineering Design Services for the Green
Street Demonstration Stormwater Capture Project on Main Street; and, direct staff to
undertake the steps necessary to finalize Council’s action.