Agenda Item · Alhambra

City Council — Item 10

Alhambra August 28, 2023 City Council Item 10
Original agenda text Item
10. NOTICE INVITING BIDS: REHABLITATION OF THE SEWER MAIN ON BEACON STREET – F2M23-61, N2M23-104 The City of Alhambra Utilities Department is responsible for inspection, maintenance and repair of the sewer system. The Wastewater Division performs regular sewer main cleaning and has an ongoing program to monitor and inspect the condition of the City’s sewer collection system. Extreme rain events over the past few months have further degraded the condition of an aging sewer pipeline. On June 6, 2023, at 1010 E. Beacon Street, the sewer main became blocked causing sewage to overflow through a manhole into the street. City’s staff contained the spill and worked to clear the blocked sewer main. Lining this section of the sewer main will reduce the risk of future potential blockages and avoid the risk of pipe failure. Due to the sewer main passing through many private properties, pipe lining is the preferred method of repair. This section of sewer main is 6 inches in diameter and about 570 feet in length. Plans and specifications have been 6 8-28-23 prepared; staff has reviewed the plans and found them to be consistent with City standards. Recommended Action: City Council approve the distribution of a Notice Inviting Bids to qualified contractors for the Rehabilitation of the Sewer Main on Beacon Street with bids due no later than 10:30 a.m. on September 14, 2023, and opened at 11:00 a.m. that same day.