Item
13. Approve the Design-Build Master Agreement (Agreements) for Water projects, each in an award
amount not to exceed $3,000,000 per work order package, plus change order authorization in
an amount not to exceed 10% of the work order package amount, for a five year term with two
extensions not to exceed 24 months, as necessary, to complete outstanding work order
packages in progress; authorize the Public Utilities General Manager, or designee, to execute
Agreements with T.E. Roberts, Inc.; W.A. Rasic Construction Company, Inc.; and Stephen
Doreck Equipment Rentals, Inc.; and such other prequalified Design-Build entities; and to take
such actions as are necessary to implement and administer the Agreements; determine that
the projects to be performed under the Agreements shall be categorically exempt under the
California Environmental Quality Act, Sections 15301, 15302, 15303, and/or 15304 of Title 14
of the California Code of Regulations; and authorize de minimis changes that do not
substantially change the terms and conditions of the Agreements, as long as such changes are
determined to be de minimis by the Office of the City Attorney.