Agenda Item
· South Gate
City Council — Item 3
Original agenda text
Item
3. Updating the consolidated salary schedule to replace the position of Water Operations
Foreman with Water Operations Supervisor.
Documents:
Item 2 Report 03262024.pdf
https://granicus_production_attachments.s3.amazonaws.com/cityofsouthgate/7d15f32488dc2512b8376163a23d37530.html 3/8
3/22/24, 2:23 PM Agenda
3. Approving Amendment No. 6 to Contract No. 3081 with Willdan Engineering for
additional Design Services for the Firestone Boulevard Regional Corridor Capacity
Enhancement Project, Phase II, City Project No. 476-TRF, Metro Call for Projects ID No.
F3124
The City Council will consider: (PW)
a. Approving Amendment No. 6 to Contract No. 3081 with Willdan Engineering, Inc. which is
necessary to extend the contract term 12 months and to fund revisions made to design and
construction documents that were necessary to re-bid the construction of the Firestone Boulevard
Regional Corridor Capacity Enhancements, Alameda Street to Hunt Avenue, Phase II, City
Project No. 476-TRF, METRO Call for Projects ID No. F3124 in an amount not-to-exceed
$40,779; and
b. Authorizing the Mayor to execute Amendment No. 6 in a form acceptable to the City Attorney.
Documents:
Item 3 Report 03262024.pdf