Agenda Item · Alhambra

City Council — Item 10

Alhambra October 14, 2024 City Council Item 10
Original agenda text Item
10. AUTHORIZE RFP: PROFESSIONAL ENGINEERING DESIGN AND CONSTRUCTION SERVICES FOR THE SEWER MAIN REPLACEMENT PROJECT ON SIERRA VISTA AVENUE – F2M24-65, RFP2M24-24 5 10-14-24 The Sewer Master Plan identified the Sewer Main Replacement Project on Sierra Vista Avenue between Los Higo Street and San Marino Avenue. The existing 8-inch pipe is expected to be surcharged during existing and ultimate peak wet weather conditions. The Master Plan recommends replacement of the existing sewer main with a larger diameter sewer main. As part of the City’s ongoing Capital Improvement Program, this project will provide engineering design, plans, and preparation of bid specifications for the replacement of approximately 1,065 feet of existing 8-inch sewer main with a larger capacity sewer main. Recommended Action: City Council approve the distribution of a Request for Proposals for Professional Engineering Design and Construction Services for the Sewer Main Replacement Project on Sierra Vista Avenue, with proposals due no later than 4:00 p.m. on November 7, 2027; and, direct staff to undertake the steps necessary to finalize Council’s action.