Agenda Item
· Los Angeles
Board of Public Works — Item 10
Original agenda text
Item
(10)
BPW20240589
SUBCONTRACTOR SUBSTITUTION – GERONIMO CONCRETE, INC.
Recommending the Board concur with the action of Commissioner Davis approving the
request of Geronimo Concrete, Inc. for the subcontractor substitution of Calvada
Surveying, Inc. with Wagner Engineering & Survey, Inc. for survey work for Sidewalk
Repair Program Package No. 64.
(W.O. E1909077)
ADMINISTRATIVE ITEM(S)