Agenda Item · Los Angeles

Port of LA — Item 8

Los Angeles April 10, 2025 Port of LA Item 8
Original agenda text Item
8. RESOLUTION NO. __________ - FINAL ENVIRONMENTAL IMPACT REPORT FOR BERTHS 191-194 ECOCEM LOW-CARBON CEMENT PROCESSING FACILITY PROJECT (APP NO. 180628-109/STATE CLEARINGHOUSE NO. 2022030294) Summary: Staff requests certification of the Final Environmental Impact Report (Final EIR) for the Berths 191-194 Ecocem Materials Ltd (Ecocem) Low-Carbon Cement Processing Facility Project (Project) prepared in accordance with the California Environmental Quality Act (CEQA). The proposed Project would construct and operate a new dry bulk processing facility at Berth 191 and on the backlands adjacent to Berths 192-194. The facility would import raw materials by ship and truck, produce a low-carbon intensity binder (ground granulated blast furnace slag [GGBFS]), and load third-party trucks that would transport the GGBFS to local consumers. As part of the proposed Project, Ecocem has also applied for a new 32-year permit. In this action, the Board of Harbor Commissioners (Board) will need to independently review and consider the Final EIR and, if deemed adequate under CEQA, certify the Final EIR; adopt specific Findings of Fact (FOF) regarding the significant environmental impacts; adopt a Statement of Overriding Considerations (SOC); and adopt a Mitigation Monitoring and Reporting Program (MMRP). With the application of mitigation, lease measures, and a standard condition, significant and unavoidable impacts and considerable contributions to significant cumulative impacts would remain in the areas of air quality and meteorology as well as noise. The Harbor Department will be financially responsible for the repairs at Berth 191. All other portions of the proposed Project are the financial responsibility of Ecocem Materials Ltd. 8. (Continued) Recommendation: Board resolve to (1) certify the Final Environmental Impact Report for the Berths 191-194 Low-Carbon Cement Processing Facility Project and that the document: (a) has been completed in compliance with the California Environmental Quality Act (Public Resources Code §21000 et seq.), with the California Environmental Quality Act Guidelines (14 Cal. Code Regs. §15000 et. seq.), and the City of Los Angeles California Environmental Quality Act Guidelines; (b) was presented to the Board of Harbor Commissioners for review and was reviewed and considered by the Board prior to approving the proposed Project; and (c) reflects the independent judgment and analysis of the City of Los Angeles Harbor Department as the Lead Agency; (2) find that, in accordance with the information contained in the Final Environmental Impact Report, the Proposed Project will have significant environmental effects on air quality, meteorology and noise, as defined by Public Resources Code Sections 21068, 21080, 21082.2, and 21083 and the State California Environmental Quality Act Guidelines Sections 15064, 15064.4, 15064.5, and 15382; (3) find that, in accordance with the provisions of the California Environmental Quality Act Guidelines Section 15091(a)(1), changes or alterations have been required in, or incorporated into, the Berths 191-194 Ecocem Low-Carbon Cement Processing Facility Project that substantially lessens or avoids one or more of the significant adverse environmental impacts identified in the Final Environmental Impact Report; (4) find that, in accordance with the provisions of the California Environmental Quality Act Guidelines Section 15091(a)(3), specific economic, legal, social, technological, or other considerations make infeasible certain mitigation measures such that environmental impacts remain significant and unavoidable; (5) find that all information added to the Final Environmental Impact Report after public notice of the availability of the Draft Environmental Impact Report for public review but before certification, merely clarifies, amplifies, or makes insignificant modifications in an adequate Environmental Impact Report, and recirculation is not necessary; (6) find that, in accordance with Public Resources Code Section 21081(b) and California Environmental Quality Act Guidelines Section 15093, the benefits outweigh the significant and unavoidable environmental impacts; (7) adopt the Findings of Fact and Statement of Overriding Considerations; (8) adopt the Mitigation Monitoring and Reporting Program as required by Public Resources Code Section 21081.6. The Mitigation Monitoring and Reporting Program is designed to ensure compliance with the mitigation and lease measures and a standard condition adopted to mitigate or avoid significant effects on the environment, and identifies the responsibilities of the City of Los Angeles Harbor Department, as Lead Agency, to monitor and verify project compliance with those mitigation and lease measures and a standard condition; (9) approve the Berths 191-194 Ecocem Low-Carbon Cement Processing Facility Project identified in the Final Environmental Impact Report including all feasible mitigation measures, lease measures and a standard condition with consideration of the Findings of Fact and Statement of Overriding Considerations, and the Mitigation Monitoring and Reporting Program; (10) direct the City of Los Angeles Harbor Department to incorporate by reference the Final Environmental Impact Report, mitigation measures, lease measures, standard condition, and Mitigation Monitoring and Reporting Program into any and all lease agreements or assignments encompassed in the approved Project; (11) authorize the Environmental Management Division to file the Notice of Determination with the Los Angeles County Clerk and the State Clearinghouse; and (12) adopt Resolution No. _______.