Encinitas
City Council
8E. Approval of Plans and Specifications for the Temporary Fire Station #1 at
Pacific View Project (CF25A) and Approval of Budget Resolution to Fund the
Project. Environmental Considerations: The project proposes to temporarily
locate a fire station and garage on a developed site. Pursuant to the California
Environmental Quality Act (CEQA) Guidelines Sections 15269(c), 15301(b),
150303(c),15303(e) and 15303(f), the project would be exempt from
environmental review. The relocation of Fire Station #1 is necessary to
address an emergency at the current location due to seismic safety conditions
of the existing building consistent with Section 15269(c) of the CEQA
Guidelines. The project is consistent with Section 15301(b) because it is
located on a developed site with existing parking and utilities such as gas,
sewer, water and electrical amenities. The project is also consistent with
Section 150303(c) because the total floor area of the two (2) temporary
buildings is less than the maximum 10,000-square foot floor area allowed
under the exemption. Section 15303(e) exempts accessory (appurtenant)
structures such as a garage. Section 15304(f) exempts minor trenching
conducted to connect to existing underground offsite utilities with surface
restoration. No historic resources are affected by the proposed project.
Contact Person: Senior Engineer Stryker
Recommended Action: 1) Approve the plans and specifications for the
Temporary Fire Station #1 at Pacific View Project (CF25A); 2) Adopt
Resolution No. 2025-44, titled "A Resolution of the City Council of the City of
Encinitas, California, Approving the Design and Plans for the Temporary Fire
Station #1 at Pacific View Project (CF25A), Pursuant to Government Code
Section 830.6"; and 3) Adopt Resolution No. 2025-45, titled "A Resolution of
the City Council of the City of Encinitas, California, Amending the Fiscal Year
2024-25 Budget" to appropriate $1,993,000 to the Temporary Fire Station #1
at Pacific View (CF25A) Project.
2025-05-14 Item 08E Temp. Fire Station 1 at PV Const. and BUA final