12. $194,578 CONTRACT WITH G2 CONSTRUCTION, INC. FOR CATCH BASIN
CONNECTOR PIPE SCREEN INSTALLATION PROJECT - FISCAL YEAR 2024-25
Proposed Motion:
1. Accept and appropriate $188,351.68 OCTA Tier 1 Grant funds in Project 52698 Catch
Basin Connector Pipe Screen Installation Project (Fund 74).
2. Approve $55,000 Drainage Capital Outlay Fund (Fund 36) budget transfer and
appropriation from Project 52591 Annual Storm Drain Repair to Project 52698 Catch
Basin Connector Pipe Screen Installation Project within the Capital Projects Fund
(Fund 74).
3. Award $194,578 construction contract for Project 52698 Catch Basin Connector Pipe
Screen Installation Project to G2 Construction, Inc. and authorize City Manager, or
designee, to execute and administer the contract, in a form approved by the City
Attorney.
4. Authorize Public Works Director, or designee, to approve change orders for
construction and professional engineering construction support services within the
approved project budget.