Agenda Item · Alhambra

City Council — Item 15

Alhambra July 28, 2025 City Council Item 15
Original agenda text Item
15. AUTHORIZE RFP: PROFESSIONAL ENGINEERING SERVICES TO UPDATE THE SEWER MASTER PLAN – F2M25-44, RFP2M25-12 The City of Alhambra existing sewer collection system is made up of a network of gravity sewers, lift stations, and force mains. The gravity system consists of approximately 129 miles of pipe, seven lift stations with 7,800 feet of forced mains, and 2,800 manholes and cleanouts. The Sewer Master Plan is to provide an evaluation of the City’s sewer collection system to provide a framework for undertaking the construction of new and replacement facilities in an effective manner. The Sewer Master Plan is intended to serve as a general, flexible, and open-ended document that requires periodic updates to consider changes in sewage generation, land development, infrastructure needs, and capital costs. The Sewer Master Plan evaluates the capacity and condition of the City’s sanitary sewer system and establishes the basis for the City’s sewer system Capital Improvement Program (CIP). Recommended Action: City Council approve the distribution of a Request for Proposals (RFP) for Professional Engineering Services to update the Sewer Master Plan, with proposals due no later than 4:00 p.m. on Thursday, August 28, 2025; and, direct staff to undertake the steps necessary to finalize the Council’s action.