Agenda Item
· Alhambra
City Council — Item 11
Original agenda text
Item
11.
NOTICE INVITING BIDS: REHABILITATION OF THE STORM DRAIN ON CARLOS
AVENUE – F2M25-64, N2M25-175
The storm drain pipe located at Carlos Avenue, which is from 2027 Carlos Avenue to
Montezuma Avenue, has been broken and needs to be repaired to handle normal water
flow before flooding occurs. Due to the pipe passing through many private properties, the
pipe lining method is a preferable way to repair the pipe. This storm drain pipe is 18-inch
in diameter and about 300 feet in length. Plans and specifications have been prepared.
Staff has reviewed the plans, and found them to be consistent with City’s standards.
Recommended Action:
City Council approve the distribution of a Notice Inviting Bids
to qualified contractors for the Rehabilitation of the Storm Drain on Carlos Avenue with
bids due no later than 10:30 a.m. on Thursday January 8, 2026, and opened at 11:00 a.m.
that same day; and, direct staff to undertake the steps necessary to finalize the Council’s
action.