Los Angeles
City Council
(10) 26-1248
PUBLIC WORKS COMMITTEE REPORT relative to emergency
preparedness, storm response, and post-recovery efforts for El Nino or
other storm related emergencies.
Recommendations for Council action, as initiated by Motion
(Hernandez – McOsker):
1. INSTRUCT the Bureau of Street Services (BSS), Bureau of
Sanitation, Bureau of Engineering, Bureau of Contract
Administration, and Bureau of Street Lighting to provide a
verbal report to Council on the emergency preparedness, storm
response, and post-recovery efforts for El Niño or other storm
related emergencies, including:
a. Crew deployment and reassignment strategies,
emergency dispatch teams, and overtime availability for
emergency preparedness, storm response, and post-
recovery efforts related to heavy rainfall and storm-related
emergencies, including, but not limited to, street flooding,
fallen trees, and mudslides; inspection, maintenance, and
debris clearance of catch basins, storm drains, and
drainage channels; response to damaged street lighting
infrastructure, including downed or struck poles, exposed
wires, conduit damage, hanging fixtures, and open covers;
sand and sandbag inventory, deployment, and distribution
plans; hillside stability and mudslide preparedness,
including inspections of vulnerable areas and emergency
response protocols; and assessment of the structural
integrity of bridges, tunnels, municipal buildings, and other
critical public infrastructure.
b. Emergency response intake and coordination protocols,
including how storm-related emergency requests are
received, prioritized, assigned, and tracked from 311, the
Mayor's Office, Council Offices, and other City
departments.
c. Recommendations and best practices for residents and
businesses to prepare for heavy rainfall, flooding,
mudslides, and other storm-related hazards.
d. Public information on accessing emergency and non-
emergency services, including relevant phone numbers,
online resources, and sandbag locations.
2. INSTRUCT the Public Works Bureaus, with assistance from the
City Administrative Officer (CAO), to periodically prepare post-
storm reports following the El Niño or other emergency
rainstorm events, including work performed and emergency
response activities undertaken, storm-related 311 service
requests received and addressed, outstanding service requests
and response activities, and damage to the public right-of-way,
including identified repair and restoration needs.
3. INSTRUCT the BSS, in consultation with the Los Angeles Fire
Department, to identify at least two fire stations and/or any other
public locations per Council District to provide sand and
sandbags, and report with the identified locations and a public
outreach plan.
4. INSTRUCT the Emergency Management Department, in
consultation with the Public Works Bureaus, to report on a
public notification strategy to inform impacted residents of
available resources and services in advance of significant storm
events, including opportunities to expand the scale and reach of
existing outreach, potential technology improvements, and the
staffing and resources necessary for implementation.
Fiscal Impact Statement: Neither the City Administrative Officer nor
the Chief Legislative Analyst has completed a financial analysis of this
report.