Los Angeles
LA County Board
27. Baldwin Lake And Tule Pond Restoration Project
Recommended as submitted by Supervisor Barger: Consider the Mitigated
Negative Declaration (MND) for the Baldwin Lake and Tule Pond Restoration
Project (Project), together with the comments received during the public review
process; find that the MND reflects the independent judgment and analysis of
the Board; adopt the Mitigation Monitoring and Reporting Program (MMRP),
finding that the MMRP Program is adequately designed to ensure compliance
with the mitigation measures during Project implementation; find on the basis of
the whole record before the Board that there is no substantial evidence the
Project may have a significant effect on the environment; adopt the MND; and
instruct the Director of Public Works to file a Notice of Determination (NOD) in
accordance with Section 21152 of the California Public Resources Code, post
the NOD to Public Works' website and pay the required filing fees to the
Registrar-Recorder/County Clerk. Approve the Project and authorize the Chief
Engineer of the Los Angeles County Flood Control District (District) to adopt the
plans and specifications and advertise for bids at an estimated construction
cost between $20,000,000 to $30,000,000. Take the following actions:
Authorize the Chief Engineer to advertise for bids with the Notice Inviting
Bids when ready to advertise this Project.
Find pursuant to California Public Contract Code Section 3400 (c) (2),
that it is necessary to specify designated items by specific brand name
in order to match other products in use on a particular public
improvement either completed or in the course of completion (Enclosure
A).
Authorize the Chief Engineer to determine whether the bid of the
apparent responsible contractor with the lowest apparent responsive bid
is, in fact, responsive and, if not responsive, to determine which apparent
responsible contractor submitted the lowest responsive bid.
Authorize the Chief Engineer to award and execute a construction
contract for the Project to the responsible contractor with the lowest
apparent responsive bid within or less than the estimated cost range of
$20,000,000 to $30,000,000 or that exceeds the estimated cost range by
no more than 15% if additional funds have been identified.
Authorize the Chief Engineer to extend the date and time for the receipt
of bids; allow substitution of subcontractors and relief of bidders; approve
and execute change orders within the same monetary limits delegated to
the Chief Engineer; accept the Project upon its final completion; and
make required findings and release retention money withheld. (26-1587)