Agenda Item · Alhambra

City Council — Item 13

Alhambra April 24, 2023 City Council Item 13
Original agenda text Item
13. NOTICE INVITING BIDS: REHABLITATION OF THE STORM DRAIN ON MONTEZUMA AVENUE – F2M23-40, N2M23-46 6 4-24-23 The City of Alhambra Utilities Department is responsible for inspection, maintenance and repair of the storm drain system in the public right-of-way and in drainage easements. The storm drain pipe at Montezuma Avenue, located from 2801 Montezuma Avenue to Ramona Avenue, has been broken and needs to be repaired to handle normal water flow before flooding occurs. Due to the pipe passing through many private properties, the pipe lining method is a preferable way to repair the pipe. This storm drain pipe is 36-inch in diameter and approximately 350 feet in length. Plans and specifications have been prepared; staff has reviewed the plans and found them to be consistent with City standards. Recommended Action: City Council approve the distribution of a Notice Inviting Bids to qualified contractors for the Rehabilitation of the Storm Drain on Montezuma Avenue Project with bids due no later than 10:30 a.m. on May 18, 2023, and opened at 11:00 a.m. that same day.