San Clemente
City Council
F. RATIFICATION OF AN EMERGENCY CONSTRUCTION CONTRACT FOR
PRIMA DESHECHA CANADA CHANNEL (FACILITY NO. M01) WALL
STABILIZATION AT GRANDE VISTA PROJECT; APPROVING A PROJECT
CONTINGENCY; AND APPROVING A SUPPLEMENTAL APPROPRIATION IN
THE AMOUNT OF $99,585
Staff Recommendation
Adopt Resolution No. 24-26, which will:
1. Make a finding that an emergency existed due to the need for immediate
channel and slope stabilization and required immediate action to protect
public health and safety, which might not have been possible if delays
attributable to the typical public competitive bidding process had been
incurred.
2. Declare that the public interest and necessity demanded the immediate
expenditure of public funds to safeguard public health.
3. Approve a supplemental appropriation in the amount of $99,585 to
Account Number 059-553-43420-000-26001 from the Storm Drain
Depreciation Fund for the Prima Deshecha Canada Channel (Facility No.
M01) Wall Stabilization at Grande Vista.
4. Ratify the Construction Contract with Diamond Construction & Design for
an amount not to exceed $77,215 for the stabilization of the M01 channel
wall and its adjacent slope.
5. Approve a 19% project contingency of $14,670.