Agenda Item
· Alhambra
City Council — Item 2
Original agenda text
Item
2. ADOPTION OF THE BICYCLE AND PEDESTRIAN IMPROVEMENT PLAN;
AUTHORIZATION TO REALLOCATE MEASURE R FUNDS FOR THE
IMPLEMENTATION OF BICYCLE AND PEDESTRIAN PLAN PROJECTS; AND
ACCEPTANCE OF ENVIRONMENTAL EXEMPTION DETERMINATION – F2M22-33,
M2M24-47
On January 8, 2024, staff presented the Bike and Pedestrian Improvement Plan for the
Council’s consideration, pursuant to data collection, a needs assessment, and public
engagement conducted throughout the Plan process. This Plan is a directive under the
City’s Strategic Plan under the goals of Enhancing Public Safety, Improving Infrastructure
and Mobility, and Promoting Sustainability. The Plan presented on January 8, 2024 was
not adopted by the Council; rather, based on public comment for additional time to review
the document, consideration to adopt the Plan was tabled to the February 12th meeting.
Staff and the City’s consultant conducted a virtual workshop on January 23, 2024; a
2
3-11-24
Special Meeting with the Transportation Commission on January 24, 2024; and an in-
person workshop at the Library on February 1, 2024. On January 24, 2024, the
Transportation Commission submitted a recommendation to adopt the Bicycle and
Pedestrian Improvement Plan, contingent on also aligning the Plan with Metro’s recent
update to their Active Transportation Plan (for regional connectivity benefits) and removing
the McLean Bridge from the City’s pedestrian or bicycle network. On February 12, 2024,
the Plan was resubmitted for the City Council’s consideration. Based on input received
that the Asian Pacific Islander Forward Movement (APIFM), a non-profit organization,
wished to provide feedback regarding the Plan, the Council directed the adoption of the
Plan be rescheduled to March to allow time for the City’s consultant to collect this
information or any other public comments received for further analysis. Feedback provided
by APIFM included approximately 200 written comments, with many responses focused
on improvements near Fremont Elementary School, such as installing high-visibility
crosswalks, compliance with speed limits and ambitious traffic calming infrastructure.
Alhambra’s Bicycle and Pedestrian Improvement Plan highlights a Backbone Bicycle
Network, Full Network (comprehensive), and Further Study Network, with a description of
the facility types or bicycle lane classification. In addition, it includes “priority” pedestrian
improvements zones based on demand, major destinations and barriers, and safety. The
estimated costs for Alhambra’s bicycle infrastructure are between $8 million and $32
million, for up to 50 miles of bike network, not including costs subject to further study. The
estimated costs for the pedestrian improvements at eight priority areas of the City are
approximately $15 million.
The Bicycle and Pedestrian Improvement Plan is available for public review via the City’s
website at https://www.cityofalhambra.org/228/Notices-Documents.
Recommended Action: City Council take the following actions:
A. Accept the Council Subcommittee’s request to adopt the Bicycle and Pedestrian
Improvement Plan (Plan);
B. Direct staff to move forward with the Backbone Bicycle Network and the Priority
Pedestrian Improvements, contingent on obtaining all the necessary funding;
C. Authorize staff to request a reallocation of $14.4 million in Measure R Funds from the
Los Angeles County Metropolitan Transportation Authority (Metro) toward the
implementation of Bicycle and Pedestrian Improvement Plan projects;
D. Accept the environmental review exemption determination for this Plan; and,
E. Direct staff undertake the steps necessary to finalize the Council’s action. (M2M24-47)
CONSENT AGENDA (Item Nos. 3 – 18)
All items listed under the Consent Agenda are considered by the City Council to be routine and
will be enacted by one motion unless a citizen or Council member requests otherwise; in which
case, the item will be removed for separate consideration.