Agenda Item
· Signal Hill
City Council — Item c
Original agenda text
Order of Business 8
c. PROFESSIONAL ARCHITECTURAL AND ENGINEERING DESIGN
CONSULTANT SERVICES AGREEMENT WITH SVA ARCHITECTS,
INCORPORATED FOR THE CITY OF SIGNAL HILL AMPHITHEATER
PROJECT
Summary:
In March 2022, City staff applied for funding for several projects, including the
Signal Hill Amphitheater Project, through Senator Lena Gonzalez’s office as part
of the 2022-23 Senate District 33 Budget Request within the premise of the
2022-23 Budget Act. After review and coordination with the Senator’s team,
Governor Gavin Newsom approved Assembly Bill 179 on September 6, 2022,
allocating five million dollars ($5,000,000) to the Signal Hill Amphitheater
Project, with the California Arts Council (CAC) designated to manage the funds.
The City’s Civic Center Master Plan, adopted by the City Council on August 27,
2024, designates the Signal Hill Amphitheater as Phase I of the implementation
plan. In alignment with this plan, staff issued a Request for Proposal (RFP) on
September 6, 2024, to secure architectural and engineering design services for
the project. The RFP outlines several design elements, including a
1,000-square-foot stage with back-of-house facilities, a green room, storage,
performer restrooms, and advanced lighting and video systems. Seating will
accommodate 400 attendees with blankets and lawn chairs, expandable to 600
with additional folding chairs. The amphitheater’s design aims to integrate
seamlessly with the Civic Center, enhancing aesthetics that reflect the City’s
history while utilizing natural grading to blend with the surrounding landscape.
The City Council will consider entering into a Professional Consultant Services
Agreement with SVA Architects, Incorporated, to provide architectural and
engineering design services for the City of Signal Hill Amphitheater Project.
Strategic Plan Goal(s):
Goal No. 1 Financial Stability: Ensure the City’s long-term financial stability
and resilience.
Goal No. 4 Infrastructure: Maintain and improve the City’s physical
infrastructure, water system, and recreational spaces.
Goal No. 5 High-Functioning Government: Strengthen internal communication,
recruitment, retention, system, and processes to increase the
effectiveness and efficiency of City services.
Recommendations:
1. Authorize the City Manager to enter into a Professional Consultant Services
Agreement with SVA Architects, Incorporated, to provide architectural and
engineering design for the Signal Hill Amphitheater Project (Project No.
90.24013), for a term of eight months and a not-to-exceed contract amount of
$627,476, in a form approved by the City Attorney; and
2. Authorize the Public Works Director to utilize a project contingency of up to
10% ($62,747.60) and approve up to a 180-calendar day term extension to
accommodate additional scope of work, changes, or unforeseen conditions.
The proposed contingency brings the total construction budget to
$690,223.60.