Agenda Item · Alhambra

City Council — Item 9

Alhambra June 22, 2026 City Council Item 9
Original agenda text Item
9. APPROVAL OF A CHANGE ORDER TO CONTRACT FOR THE STORM DRAIN REHABILITATION PROJECT ON CARLOS AVENUE - F2M25-64, C2M26-5, M2M26- On January 26, 2025, the City Council approved an award of Contract to Torres Sanitation Systems Construction for the Storm Drain Rehabilitation Project on Carlos Avenue in an amount not to exceed $100,300.00 (C2M26-5). The Storm Drain Pipe Repair Project originally intended to rehabilitate a failing drainage line from 2027 Carlos Avenue to Montezuma Avenue. Due to the alignment passing multiple private properties, a trenchless pipe-lining method was selected to minimize surface disruption. However, pre- lining video inspections revealed severe structural deterioration undetected during initial assessments. Portions of the existing corrugated metal pipe were completely rusted out, leaving the pipe without a bottom section. This structural failure made immediate trenchless lining technically infeasible without structural stabilization. To resolve this issue and complete the project, the contractor must perform open-trench spot repairs at three distinct locations. This proposed Change Order covers the direct costs of these structural spot repairs, alongside necessary site restoration efforts including concrete paving, soil leveling, and property cleaning. Recommended Action: City Council approve Change Order No. 1 for the Storm Drain Rehabilitation Project on Carlos Avenue, increasing Contract No. C2M26-5 with Torres Sanitation Systems Construction by $48,000.00 and bringing the total revised contract value to an amount not to exceed $148,300.00 to complete the project; appropriate $48,000.00 from the Safe Clean Water Program Fund to cover the change order; and, direct staff to undertake the steps necessary to finalize the Council’s action. (M2M26-83)